Automotive

How did an automotive OEM cut raw material price amendments from 4 weeks to 2 days?

Last updated:

At a glance

A large Indian automotive OEM with more than ₹10,000 Cr in revenue, 500+ suppliers and 20,000+ parts used Cost It Right (CIR) by Softude to replace Excel-based costing and email-based sourcing with one system.

CIR linked metal grades to live indexes, moved 25,000 part costings into standard cost cards and brought RFQs, auctions and vendor onboarding onto one portal.

Raw material price amendments now take 2 days instead of 3 to 4 weeks, and savings in the second year of use were an estimated ₹48 Cr.

Who this case study is for: For costing heads, cost engineers, purchase and commodity managers, finance controllers and CXOs at automotive OEMs, Tier 1 and Tier 2 suppliers and other manufacturers exposed to metal and polymer price changes.

Read the story
Steel coil feeding a stamping press for car panels while a purchase head tracks raw material price indexation on a tablet
  • ₹48 Cr Estimated annual savings
  • 90% Faster raw material price amendments
  • 68% Reduction in costing cycle time
  • 2 days From index change to approved price, down from 3 to 4 weeks

The context

Client and industry

The client is a large Indian automotive OEM with more than ₹10,000 Cr in revenue and multiple plants in India. Its name is withheld for confidentiality, and all figures were reviewed and approved by the customer.

  • Industry: automotive OEM
  • Scale: ₹10,000+ Cr revenue
  • Footprint: multiple plants in India
  • Supply base: 500+ suppliers and 20,000+ parts

The company was growing fast, but its cost control was not.

The problem

The challenge

Every raw material price change meant a month of spreadsheets.

Metal and polymer prices changed every few weeks, and each change touched thousands of parts and hundreds of suppliers. Costing ran on disconnected Excel files. Price revisions took a month, supplier claims went unchecked, and money leaked out quietly with every cycle.

This is what one typical steel revision set off before Cost It Right, based on averages from the 12 months before go-live:

  • 1 steel index revision affected 2,500 active part costings
  • 12 engineers rebuilt those costings in Excel
  • It took 3 to 4 weeks from the index change to an approved price

The question the company had to answer: how do we react to every price change in days, pay suppliers only what the index justifies, and do it without adding people?

For a wider view, read how manufacturers can tackle raw material cost fluctuations.

Why existing methods fell short

Excel-based costing and email-based sourcing could not keep up with the pace of price changes. The team was up against six problems:

  • Paying claims it could not check: suppliers sent price increases based on their own rates, with no quick way to test them
  • Many versions of the truth: each engineer kept cost cards in personal Excel files that rarely matched the ERP
  • Quotes that could not be compared: suppliers replied by email in their own formats, so awards took 4 to 6 weeks
  • Knowledge that walked out the door: when a senior engineer left, years of formulas and history left too
  • Weeks to add a supplier: new vendors waited around 6 weeks for forms, audits and approvals
  • Audits that took days: every audit query meant digging through mail threads and old files

The turning pointCost It Right (CIR)

The solution

How Cost It Right solved it

Cost It Right (CIR) by Softude gave the company one system for costing and sourcing, rolled out in three phases over 10 months.

The team scored an ERP add-on, a global costing suite and an in-house build against four needs: part-level costing, formats for Indian processes, time to go live and ERP integration. Cost It Right was the only option that met all four.

  • Months 1 to 3, masters and costing: weeks 1 to 10 went to cleaning masters, then 25,000 part costings moved out of Excel into standard cost cards
  • Months 3 to 5, indexation and amendments: metal grades were linked to live indexes, so every change is simulated before approval
  • Months 5 to 10, sourcing and vendors: the RFQ portal, auctions and vendor onboarding went live in month 7 with the top 50 suppliers first, and all suppliers were on by month 10

Clean data had to come first. The old Excel files held duplicate RM grades, outdated machine rates and costing logic that differed from plant to plant, so a joint team spent the first 10 weeks agreeing one standard format per process and cleaning every master.

Then suppliers had to come on board. Most were used to quoting by email, so the portal started with the top 50 suppliers by spend and the rest joined over the next three months. All modules were live in month 7, and more than 180 users now work in CIR across costing, purchase, engineering, finance and plants.

Today the same steel revision is handled in two days:

  • Day 1, index updates: the new steel rate flows in from the external index
  • Day 1, impact simulated: every affected part, assembly and vehicle is repriced
  • Days 1 to 2, claims checked: each supplier claim is compared with the index-justified rate
  • Day 2, approved: approvers see the full impact before signing off
  • Day 2, ERP updated: new prices sync to purchase orders automatically

Problem, CIR capability and result

Problem CIR capability used Result
Paying supplier claims it could not check RM indexation, RM price amendments Every claim checked against the index: ₹31 Cr in payments avoided in the second year
Many versions of the truth in personal Excel files Digital cost cards, centralized costing data 25,000 part costings moved into standard cost cards
Quotes that could not be compared RFQ and sourcing management, should-cost analysis, reverse auction RFQ to award 45% faster, ₹14 Cr from should-cost negotiation and ₹3 Cr from auctions
Knowledge that walked out the door Centralized costing data, workflow and approval automation Formulas, versions and approvals kept in the system
Weeks to add a supplier Vendor onboarding Onboarding 70% faster, from about 6 weeks to 12 days

The impact

Results and business impact

A month of work now closes in two days. "Before" is the 12 months before go-live and "after" is the second full year of use.

Measure Before After Change
RM price amendment cycle 3 to 4 weeks 2 days About 90% faster
Costing time per part About 6 hours About 2 hours 68% faster
RFQ to award turnaround 4 to 6 weeks 2.5 to 3 weeks 45% faster
Vendor onboarding About 6 weeks 12 days 70% faster

Savings in the second year of use were an estimated ₹48 Cr, more than the total first-year cost of the platform:

  • ₹31 Cr from index-validated amendment claims
  • ₹14 Cr from should-cost backed negotiation
  • ₹3 Cr from reverse auctions on logistics and indirect spend

A steel revision came in on a Monday. By Wednesday we knew the impact on every part, had pushed back on claims the index did not support, and had new prices in the ERP.

Head of Purchase, Name withheld

Key takeaways

  • Linking metal grades to live indexes turned a 3 to 4 week amendment cycle into 2 days
  • Checking every supplier claim against the index named in the contract saved ₹31 Cr in a year, counted as payments avoided
  • Clean, standard masters came first: 10 weeks of data cleaning made the automation possible
  • Starting the supplier portal with the top 50 suppliers by spend got adoption moving before the rest joined
  • Costing knowledge now stays in the system instead of leaving with people

"When one of our senior costing engineers retired, we lost nothing. His formulas, versions and approvals were already in the system." Head of Cost Engineering, name withheld.

Your playbook

How to replicate this

  1. 1. Clean masters first: agree one standard format per process and remove duplicate RM grades and outdated rates
  2. 2. Move part costings out of Excel into standard digital cost cards
  3. 3. Link each metal grade to the live index named in supplier contracts
  4. 4. Simulate every index change across parts, assemblies and vehicles before approval
  5. 5. Check each supplier claim against the index-justified rate before paying it
  6. 6. Onboard the top suppliers by spend to the portal first, then the rest, and sync approved prices to the ERP

Under the hood

Cost It Right capabilities

The full story

See the full case study in detail

Get the complete case study as a PDF. Enter your work email and it opens straight away.

Book a Demo

Keep reading

From the blog

Good to know

Frequently asked questions

  • Before Cost It Right, a steel index revision took 3 to 4 weeks from index change to approved price, with 12 engineers rebuilding 2,500 part costings in Excel. With Cost It Right (CIR) by Softude, the same revision is handled in 2 days, about 90% faster.

  • Savings in the second year of use were an estimated ₹48 Cr: ₹31 Cr from index-validated amendment claims, ₹14 Cr from should-cost backed negotiation and ₹3 Cr from reverse auctions on logistics and indirect spend. That was more than the total first-year cost of the platform.

  • All modules were live in month 7 and all suppliers were on the portal by month 10. The first 10 weeks went to cleaning masters, then 25,000 part costings moved into standard cost cards, followed by indexation, amendments, sourcing and vendor onboarding.

  • The team scored an ERP add-on, a global costing suite and an in-house build against four needs: part-level costing, formats for Indian processes, time to go live and ERP integration. Cost It Right was the only option that met all four.

  • Raw material indexation links the material part of a component's price to a published index, such as a steel or polymer price index. When the index moves, the part price is revised by a formula agreed in the contract instead of by negotiation. In this case study, the OEM linked metal grades to live indexes in Cost It Right (CIR) by Softude.

  • Compare each claim with the increase that the contract's index actually justifies, part by part, and pay only the justified amount. CIR does this for every affected part, and this OEM avoided ₹31 Cr in payments in a year by paying index-justified rates.

  • Index-based pricing sets or revises a supplier's price according to a named market index plus agreed terms, so price changes follow the market transparently. To run it at scale, this OEM moved 25,000 part costings into standard cost cards and linked metal grades to live indexes.